EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
phowe
-
Listing for Category : empennage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (415)
Research
- (1)
Workshop
- (2)
Empennage
- (2)
-
Removed Vertical...
-
Worked on the...
Fuselage
- (71)
Firewall
- (11)
Tail Feathers
- (37)
Wings
- (86)
Controls
- (11)
Avionics
- (30)
Lighting
- (13)
Instrument Panel
- (6)
Landing Gear
- (16)
Engine
- (30)
Propeller
- (7)
Fuel System
- (18)
Interior Finish
- (46)
Rigging
- (6)
Paint / Decals
- (10)
Inspection
Tools
MISC
- (12)
Builder Name:
Philip Howe
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1711.75
Total Flight Time:
6
Total Expense:
N/A
Start/Last Date:
Oct 19, 2020 - No Finish Date
Engine:
Rotax 915is
Propeller:
Whirlwind
Panel:
Dynon
Friendly URL:
https://eaabuilderslog.org?s=phowe
Home or Last Project Picture
Feb 16, 2022
Removed Vertical Stab and rudder
- (7 hours)
Category: Empennage
We had filed the bushings on the vertical stab to get the rudder to swing better. We rethought this and ordered new bushings. removed the old ones and ordered new ones. We added the rubber bottom strip that we had missed the first time. I don't enjoy putting this on and off. Definitely a 2 person job.
Photo Feb 16, 1 07 14 PM.jpg
Photo Feb 16, 1 07 17 PM.jpg
Photo Feb 16, 1 27 55 PM.jpg
Photo Feb 16, 9 32 07 AM.jpg
Photo Feb 16, 9 32 18 AM.jpg
Nov 18, 2021
Worked on the optional Horizontal Stab grab handle
- (1 hour)
Category: Empennage
We went back and worked on this part left over from the early stages. Riveted the doublers in and bought replacement tubes at I wanted longer handles. We will finish later.
Photo Nov 18, 8 18 51 AM.jpg
Photo Nov 18, 8 18 57 AM.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.